Jump to content
Wolfman63

1:350 USS Carl Vinson Project

Recommended Posts

Sweet! I can't wait to see more!

Share this post


Link to post
Share on other sites

CVN-70 Project - Starting on the island Drilling lots of holes to light up the numbers and adding LED's for the island rooms. The lighted 70 looks funky because the fibers still need trimming after I paint the walls. Over 50' of fiber optic just to light the numbers on one side of the island. Working on the other side next.

 

20992678_10209971782918634_5307706666170

20953132_10209971784518674_5754445624690

 

19642368_10209971782678628_6106599360677

20883011_10209971783278643_1323851885050

 

20953483_10209971783238642_7109982382551

Share this post


Link to post
Share on other sites

Now that's ingenious, and I'm betting will be a real attention grabber! :smiley20:

 

GIL :smiley16:

Share this post


Link to post
Share on other sites

This week I started working on the island. I ran all the fiber optic lines to light up the ship numbers and the yellow flood lights that light up the flight deck. Surprisingly I was able to get the lines routed with room to spare. I also modified the level for the Mk 95 NSSM director bays and added the LED light.

21077661_10210002858015492_8450298845128

 

21078329_10210002857975491_6327150427253

 

21106452_10210002857815487_6458478656947

 

21034261_10210002858575506_7243340366675

 

21077261_10210002857895489_6503495673396

Share this post


Link to post
Share on other sites

The lower section of the island is now done. I trimmed the fiber optics and applied the decals.

21105525_10210017204454144_8161357108181

 

21034490_10210017204654149_3686401540879

 

21106604_10210017204574147_2835087275622

Share this post


Link to post
Share on other sites

The upper levels of the island are together. Need to start building the 19 aircraft that will be placed in the hangar bay so I can assemble and wire up the ship.

21105716_10210028787863722_4352309833113

 

21150014_10210028789543764_4963484225436

 

21078410_10210028787983725_7272450701383

 

21151256_10210028789343759_1784854040644

 

21149964_10210028787823721_6706286473855

 

21151515_10210028787783720_5188301523004

Share this post


Link to post
Share on other sites

Here is the first proof sheet of the decals for the aircraft. I will be doing all 86 aircraft that was aboard when the ship pulled out of Norfolk Virginia in March of 1983. Still need to do the decals for the A-6's as well as all the numbers for all the aircraft.

 

21230792_10210038032614835_2518463451242

Share this post


Link to post
Share on other sites

Decals look great. Are you doing them yourself or having someone make / print them?

 

Dave

Share this post


Link to post
Share on other sites

I am making them myself. I made all the hangar bay decals as well. The aircraft came with the standard insignias and markings. I just need to make the squadron specific and numbers.

Share this post


Link to post
Share on other sites

Here is the rest of the decals. The A-6 squadron and the various numbers and letters for the aircraft. Starting to build aircraft tomorrow.

21246185_10210045448600230_3207140021977

Share this post


Link to post
Share on other sites

Loving this project.

Share this post


Link to post
Share on other sites

Started building and detailing the aircraft for the hangar bay. Adding the photoetched parts on a 1:350 aircraft takes some time. Planning on 28 aircraft staged on the hangar deck. So far eight of the A-7's are built. Plan is to build all, then paint all, and finally decal all.

 

21192743_10210066466365661_6547675953454

 

21272527_10210066466285659_4606827868215

 

21272303_10210066466325660_2471400964126

Share this post


Link to post
Share on other sites

Started painting the planes and decided to scratch-build a scaffold for the cockpit. This plane will have it's cockpit open and the scaffold next to it on the hangar deck.

21369532_10210093866570649_4267147897955

  • Like 1

Share this post


Link to post
Share on other sites

Man that rocks! Outstanding work on that scaffolding. That kinda reminds me of another cutaway build I saw of the USS Wasp LHA that someone did. Inside the hanger he had one of the AV-8's 'opened up' with the Pegasus engine sitting on a dolly next to the plane.

 

Keep going, this is awesome! I can't wait to see more!

Share this post


Link to post
Share on other sites

I am just about done with the A-7's for the hangar deck. So in terms of time it takes about 3 hours per aircraft to build, detail, paint and decal. I sealed the decals and just need to install the canopies. Then start the F-14's. Here is a picture of the A-7's having decals put on.

21370925_10210111146442635_2442151001068

  • Like 1

Share this post


Link to post
Share on other sites

The A-7's are complete and staged in hangar bay 2. The hangar bay is now done. Now on to the F-14's of hangar bay 3.

21430482_10210118204059071_9581542391204

21430607_10210118203979069_5016655114896

 

21462356_10210118204019070_8154225497234

  • Like 1

Share this post


Link to post
Share on other sites

Wow! Magnificent! I almost feel like I'm looking into a real ship in those shots through the elevator opening! Beautiful job!

Share this post


Link to post
Share on other sites

Fantastic.

 

How do you keep up the momentum for this build? Just plowing through it? Great detail in all the pics too.

 

I applaud you sir! :smiley31:

Share this post


Link to post
Share on other sites

Working on the F-14's for hangar bay # 3. I have the placement and all the planes detailed with the PE parts. Next up is to paint and decal them. Four will be VF-51 and four will be VF-111.

 

21557616_10210163483471028_3622322886316

21557730_10210163482951015_3688275489084

 

21463194_10210163482991016_3036827886890

 

21463315_10210163492031242_1434302338272

Share this post


Link to post
Share on other sites

The F-14's for hangar bay 3 are now complete. Here are some pictures of Bay 3 as well as close-ups of the F-14's. Starting on hangar bay 1 next.

 

21743310_10210200075185798_3771580268017

 

21761405_10210200085826064_3065567024992

 

21762078_10210200075745812_1611636705327

 

21768182_10210200075865815_8186409620404

 

21618050_10210200077665860_4127514863736

 

21761581_10210200076105821_2471122323819

 

21768095_10210200078425879_1091071214741

 

21687407_10210200077225849_7181939546961

 

21766587_10210200079025894_8515919818594

 

21768080_10210200078185873_2921681759255

 

21687636_10210200077905866_2600362500826

Share this post


Link to post
Share on other sites

Working on the two SH-3 helicopters for hangar bay 1. This one modified to have the sliding door open and rotors folded. Second one will have rotors and tail folded. Had to scratch build the struts. Will post pictures of both in hangar bay once the second is done.

36669952394_261b2433b1_c.jpg

23527008948_d665fc824f_c.jpg

37348869832_3a5333e5b9_c.jpg

23527007508_87e8c7170a_c.jpg

Share this post


Link to post
Share on other sites

Most impressive! This really looks better and better each time I see more!

Share this post


Link to post
Share on other sites

Here are the rest of the pictures of the SH-3H helicopters and the start of the S-3A showing the PE details.

37358217586_31ff01d375_c.jpg

 

37148452890_ee1051cbeb_c.jpg

 

23553346808_b42b49eb0e_c.jpg

 

23553342758_1f00ac171d_c.jpg

 

23553341248_ab4992a5a7_c.jpg

 

37148450840_607ff0260b_c.jpg

Share this post


Link to post
Share on other sites

The two S-3A's from VS-29 for hangar bay 1 are now complete. Next up us the two EA-6B's.Then I just have the A-6E's and E-2C's to complete.

 

37404055472_bb33267892_c.jpg

 

37387605806_19a7fd5b04_c.jpg

 

37404053522_0a5f417080_c.jpg

 

36764755103_7087fca3e5_c.jpg

 

36725512884_57f02c1e8d_c.jpg

 

37177754590_96f93a4b84_c.jpg

Share this post


Link to post
Share on other sites

×
×
  • Create New...